Evaluation of the Canadian Space Agency’s International Space Station Assembly and Maintenance Operations Program, for the period from March 2008 to March 2015: ST99-49/2016E-PDF

“This report presents the findings of the Evaluation of the Canadian Space Agency (CSA)’s International Space Station (ISS) Assembly and Maintenance Operations Sub-Sub Program (SSP). The evaluation was conducted on behalf of the CSA Audit and Evaluation Directorate by Kelly Sears Consulting Group in collaboration with Beechwood Consulting and Research Inc., BBMD Consulting Inc., and Hickling Arthurs Low Corp. between December 2014 and February 2016. The evaluation is a requirement of the CSA five-year evaluation plan and was conducted in accordance with the Treasury Board (TB)’s Policy on Evaluation (2009) requiring that all federal programs be evaluated every five years"--Introd., p. 1.

Permanent link to this Catalogue Record: What is a permanent link?
http://publications.gc.ca/pub?id=9.842445&sl=0
MARC XML Format   MARC HTML Format

Department/Agency Canadian Space Agency. Audit and Evaluation Directorate.
Title Evaluation of the Canadian Space Agency’s International Space Station Assembly and Maintenance Operations Program, for the period from March 2008 to March 2015
Publication Type Monograph
Language [English]
Other Language Editions [French]
Format Electronic
Electronic Document

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact the authoring department to request a format other than those available.

We invite you to consult the Frequently Asked Questions page for additional information regarding the Archived Content notice.


Having trouble opening this document?

Note: The URLs contained in this/these document(s) may no longer be functional
Note Issued also in French under title: Évaluation du Programme d’opérations d’assemblage et d’entretien de la Station spatiale internationale de l’Agence spatiale canadienne, pour la période allant de mars 2008 à mars 2015. Cover title. "Project # 14/15 - 02-01." "February 2016."
Date 2016.
Number of Pages xii, 80 p.
Catalogue Number
  • ST99-49/2016E-PDF
Subject Terms Space station, Space technology, Program assessment