000 01892cam  2200277za 4500
0019.845800
003CaOODSP
00520221107153041
007cr |||||||||||
008171019s1983    bcc    #o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn-bc
0861 |aEn39-33/1983E-PDF
1101 |aCanada. |bEnvironment Canada.
24510|aEnvironment Canada review of the Keenleyside - Murphy hydroelectric projects |h[electronic resource] : |bdetailed environmental studies.
260 |aVancouver, B.C. : |bEnvironment Canada,|c[1983].
300 |a18, [6 ] p.
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
504 |aIncludes bibliographical references.
5052 |aEnvironment Canada review of the Murphy Creek hydroelectric project: detailed environmental studies -- Environment Canada review of the Keenleyside powerplant and Keenleyside - Murphy Creek transmission projects: detailed environmental studies.
5200 |a"As a result of the Task Force review, Environment Canada has no significant environmental concerns to raise regarding the Keenleyside Powerplant and Keenleyside-Murphy Creek Transmission Projects. ... Because the planned Keenleside-Murphy hydroelectric projects are likely to result in changes in total dissolved gas concentrations and in their downstream distribution in the lower reaches of the Columbia River, it is recommended that a detailed study of gas supersaturation be carried out. The study area should include the Columbia River between the Hugh Keenleyside Dam and the International Bounday"--p. [20].
69207|2gccst|aHydroelectric plants
69207|2gccst|aEnvironmental impact assessment
85640|qPDF|s910 KB|uhttps://publications.gc.ca/collections/collection_2017/eccc/En39-33-1983-eng.pdf