00000000nam 2200000za 4500
0019.608842
003CaOODSP
00520250221074203
007ta
008150406|1993||||xxc|||||     f|0| 0 eng d
020 |a0-662-20636-3
022 |a1192-3571
040 |aCaOODSP|beng
043 |an-cn---
0861 |aR71-49/3-7-1E
1102 |aNorthern River Basins Study (Canada)‏.
24510|aWinter low flow tracer dye studies : |bAthabasca River, Athabasca to Bitumount, February and March, 1992, Part I: time of travel / |cby G. Van Der Vinne and D. Andres.
260 |aEdmonton - Alberta : |bNorthern River Basins Study |c1993.
300 |a38, 20p. : |bgraphs, maps, references, tables ; |c28 cm.
4901 |aNorthern River Basins Study project report|x1192-3571|v7
500 |a"A field investigation covering a reach of the Athabasca River between Athabasca and Bitumount was performed to define the travel times in the river relative to the hydraulic characteristics."--Abstract.
5203 |aA field investigation covering a reach of the Athabasca River between Athabasca and Bitumount was performed to define the travel times in the river relative to the hydraulic characteristics.--Abstract
563 |aRing binding
69007|aRivers|2gcpds
69007|aIce|2gcpds
7201 |aVan Der Vinne, G.
7201 |aAndres, D.
7760#|tWinter low flow tracer dye studies, Athabasca River, Athabasca to Bitumount, February and March, 1992. |w(CaOODSP)9.948239
830#0|aNorthern River Basins Study project report,|x1192-3571|v7|w(CaOODSP)9.514881