00000000nam 2200000za 4500
0019.611289
003CaOODSP
00520250501144727
007ta
008150406|1994||||xxc|||||     f|0| 0 eng d
020 |a0-662-22364-0
022 |a1192-3571
040 |aCaOODSP|beng
043 |an-cn---
0861 |aR71-49/3-36E
1102 |aNorthern River Basins Study (Canada)‏.
24510|aWinter under-ice tracer dye studies, time of travel, and mixing characteristics : |bPeace River, Shaftesbury Ferry to Notikewin River, February and March, 1993 / |cPrepared by Northwest Hydraulic Consultants Ltd.
260 |aEdmonton - Alberta : |bNorthern River Basins Study |c1994.
300 |a153p. in various pagings. : |bfigs., graphs, references, tables ; |c28 cm.
4901 |aNorthern River Basins Study project report|x1192-3571|vNo. 36
500 |a"Travel time and mixing characteristics for contaminants in the Peace River downstream of the Smoky River mouth were determined by means of a dye tracer test conducted at the end of February and beginning of March 1993. A single dose of dye was injected through the ice at Shaftesbury Ferry, approximately 25 km upstream of Peace River town, and the spreading dye cloud was tracked as far as the Notikewin River, about 160 km downstream of the town."--Report summary.
5203 |aTravel time and mixing characteristics for contaminants in the Peace River downstream of the Smoky River mouth were determined by means of a dye tracer test conducted at the end of February and beginning of March 1993. A single dose of dye was injected through the ice at Shaftesbury Ferry, approximately 25 km upstream of Peace River town, and the spreading dye cloud was tracked as far as the Notikewin River, about 160 km downstream of the town.--Report summary
563 |aRing binding
69007|aIce|2gcpds
7760#|tWinter under-ice tracer dye studies, time of travel and mixing characteristics, Peace River, Shaftesbury Ferry to Notikewin River, February and March, 1993 / |w(CaOODSP)9.950740
830#0|aNorthern River Basins Study project report,|x1192-3571|vNo. 36|w(CaOODSP)9.514881
986 |aProject 120-B1