000 01709nam##2200277za#4500
0019.695162
003CaOODSP
00520210624234441
007cr |||||||||||
008150407|2011||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-19544-5
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-105/2011E-PDF
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aComprehensive study report - Detour Lake Gold Mine |h[electronic resource]
260 |aOttawa - Ontario : |bCanadian Environmental Assessment Agency |cNovember 2011.
300 |a195p.|bcoloured map, references, tables, photographs
500 |aThe catalogue number (En106-105/2011E) and ISBN (978-1-100-19543-8) for the print edition have been incorrectly copied in this PDF version.
5203 |aThe Detour Gold Corporation (the proponent) is proposing to develop an open pit gold mine located on the northern edge of the Canadian Shield in northeastern Ontario. The purpose of this comprehensive study report (CSR) is to provide a summary of the information and analysis that the Canadian Environmental Assessment Agency (the Agency) considered in reaching its conclusion on whether the Project is likely to cause significant adverse environmental effects.
590 |a12-03|b2012-01-20
69007|aMining industry|2gcpds
69007|aEnvironmental impact assessment|2gcpds
77508|tRapport d'étude approfondie - La mine d'or de Detour Lake |w(CaOODSP)9.639303
7760#|tComprehensive study report - Detour Lake Gold Mine |w(CaOODSP)9.652411
85640|ahttp://publications.gc.ca|qPDF|s2400 KB|uhttps://publications.gc.ca/collections/collection_2012/acee-ceaa/En106-105-2011-eng.pdf