000 01910nam##2200265za#4500
0019.696597
003CaOODSP
00520210624235115
007cr |||||||||||
008150407|2012||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-21138-1
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-109/2012E-PDF
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aComprehensive study report - Canpotex potash export terminal and Ridley Island road, rail, and utility corridor |h[electronic resource]
260 |aOttawa - Ontario : |bCanadian Environmental Assessment Agency |cSeptember 2012.
300 |a87p.|bmaps, tables
5203 |aCanpotex Terminals Limited (Canpotex) and the Prince Rupert Port Authority (PRPA) are each proposing to undertake projects on Ridley Island in the Port of Prince Rupert, British Columbia. Canpotex is proposing to construct and operate the Canpotex Potash Export Terminal and the PRPA is proposing to construct the Ridley Island Road, Rail and Utility Corridor (RRUC). The Canpotex Potash Export Terminal will have the capacity to export up to 11.5 million tonnes of potash annually. This report presents the Canadian Environmental Assessment Agency’s (the Agency) analysis to determine whether the Project is likely to cause significant adverse environmental effects.
590 |a12-42|b2012-10-19
69007|aEnvironmental impact assessment|2gcpds
69007|aMinerals|2gcpds
77508|tRapport d'étude approfondie - projet de terminal potassier Canpotex et corridor ferroviaire, routier, et de services publics |w(CaOODSP)9.640705
7760#|tComprehensive study report - Canpotex potash export terminal and Ridley Island road, rail, and utility corridor |w(CaOODSP)9.652575
85640|ahttp://publications.gc.ca|qPDF|s2.92 MB|uhttps://publications.gc.ca/collections/collection_2012/acee-ceaa/En106-109-2012-eng.pdf