000 01800nam##2200277za#4500
0019.697124
003CaOODSP
00520210624235336
007cr |||||||||||
008150407|2012||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-21627-0
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-112/2013E-PDF
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aComprehensive study report - Little Bow Reservoir rehabilitation and upgrading project |h[electronic resource]
260 |aOttawa - Ontario : |bCanadian Environmental Assessment Agency |cDecember 2012.
300 |a95p.|bfigs., tables
500 |aThe catalogue number (En106-112/2013E) and ISBN (978-1-100-21626-3) for the print edition have been incorrectly copied in this electronic publication.
5203 |aThe Alberta Ministry of Transportation (AT), the proponent, proposes to construct new structures and modify existing structures in the Little Bow Reservoir, and in the connecting canal to the Travers Reservoir (TLBR Connecting Canal). The purpose of this report is to present the results of the process carried out by the Canadian Environmental Assessment Agency (the Agency) to determine whether the Project is likely to cause significant adverse environmental effects.
590 |a13-08|b2013-02-22
69007|aEnvironmental management|2gcpds
69007|aFresh water|2gcpds
77508|tRapport d'étude approfondie - Projet de remise en état et de modernisation du réservoir Little Bow |w(CaOODSP)9.641192
7760#|tComprehensive study report - Little Bow Reservoir Rehabilitation and Upgrading project |w(CaOODSP)9.652630
85640|ahttp://publications.gc.ca|qPDF|s1.39 MB|uhttps://publications.gc.ca/collections/collection_2013/acee-ceaa/En106-112-2013-eng.pdf