000 01394nam##2200265za#4500
0019.698582
003CaOODSP
00520210625000008
007cr |||||||||||
008150407|2013||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-22870-9
040 |aCaOODSP|beng
043 |an-cn---
0861 |aNE23-121/1-2013E-PDF
1101 |aCanada. |bNational Energy Board.
24510|aInformation for proposed pipeline or power line projects that do not involve a hearing |h[electronic resource]
260 |aCalgary - Alberta : |bNational Energy Board |cNovember 2013.
300 |a2p.|bphotographs
5203 |aOutlines the general information and process for facilities applications that do not involve a hearing, such as pipelines that are less than 40 kilometers long, deactivations, reactivations, construction of meter stations, and other small scale projects.
590 |a14-09|b2014-02-28
69007|aEnergy supply|2gcpds
69007|aPipelines|2gcpds
77508|tRenseignements utiles à l'égard de projets de pipeline ou de ligne de transport d'électricité qui ne nécessitent pas d'audience |w(CaOODSP)9.642589
7760#|tInformation for proposed pipeline or power line projects that do not involve a hearing |w(CaOODSP)9.652764
85640|ahttp://publications.gc.ca|qPDF|s742 KB|uhttps://publications.gc.ca/collections/collection_2014/one-neb/NE23-121-1-2013-eng.pdf