000 01661nam  2200289za 4500
0019.810498
003CaOODSP
00520221107140856
007cr |||||||||||
008160404s2016    onc     o    f000 0 eng d
020 |a978-0-660-04505-4
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-147/2016E-PDF
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aOperational policy statement |h[electronic resource] : |binformation requests and timelines.
24630|aInformation requests and timelines
260 |a[Ottawa] : |bCanadian Environmental Assessment Agency, |c2016.
300 |aii, 3 p.
500 |aIssued also in French under title: Énoncé de politique opérationnelle, demandes de renseignements et échéanciers.
500 |a“February 2016.”
520 |aCEAA 2012 sets time limits for the conduct of environmental assessments (EA) of designated projects. The timeline for a specific assessment is paused when the proponent is required to provide information or conduct studies necessary for the environmental assessment. This OPS explains the pausing of timelines by the Canadian Environmental Assessment Agency (the Agency) as a result of an information request and is intended to provide transparency and certainty with respect to calculations regarding timelines.
69207|2gccst|aEnvironmental impact assessment
69207|2gccst|aInformation requests
69207|2gccst|aGovernment policy
77508|tÉnoncé de politique opérationnelle |w(CaOODSP)9.810500
85640|qPDF|s449 KB|uhttps://publications.gc.ca/collections/collection_2016/acee-ceaa/En106-147-2016-eng.pdf