000
| 01692nam 2200277za 4500 |
---|
001 | 9.810534 |
---|
003 | CaOODSP |
---|
005 | 20221107140900 |
---|
007 | cr ||||||||||| |
---|
008 | 160204s2004 onc o f000 0 eng d |
---|
040 | |aCaOODSP|beng |
---|
043 | |an-cn--- |
---|
086 | 1 |aD58-115/2004E-PDF |
---|
245 | 10|aReport |h[electronic resource] : |bpreliminary risk analysis of contracts. |
---|
246 | 30|aPreliminary risk analysis of contracts |
---|
260 | |a[Ottawa] : |bNational Defence, |c2004. |
---|
300 | |aiii, 2, 16, [16] p. : |bfig., tables. |
---|
500 | |aIssued also in French under title: Rapport, analyse préliminaire des risques liés aux contrats. |
---|
500 | |a"January 2004." |
---|
520 | |aThis report presents a description and first application of a risk analysis methodology developed by the Chief Review Services (CRS) addressing service contracting within the Department of National Defence. The analysis was performed at the direction of the Deputy Minister following difficulties experienced with certain large operations and maintenance contracts. The principal objective was to design and apply a systematic methodology to anticipate other contracts which may be at risk. The methodology is intended for ongoing use by management – CRS work continues to extend the analysis to additional aspects of contracting and expenditure management. |
---|
692 | 07|2gccst|aFederal departments |
---|
692 | 07|2gccst|aContracts |
---|
692 | 07|2gccst|aRisk management |
---|
710 | 1 |aCanada.|bDepartment of National Defence.|bChief Review Services. |
---|
775 | 08|tRapport |w(CaOODSP)9.810535 |
---|
856 | 40|qPDF|s1.19 MB|uhttps://publications.gc.ca/collections/collection_2016/mdn-dnd/D58-115-2004-eng.pdf |
---|