000
| 02044nam 2200265za 4500 |
---|
001 | 9.814714 |
---|
003 | CaOODSP |
---|
005 | 20221107141838 |
---|
007 | cr ||||||||||| |
---|
008 | 160408s2014 onc o f000 0 eng d |
---|
040 | |aCaOODSP|beng |
---|
043 | |an-cn--- |
---|
086 | 1 |aV32-302/2014E-PDF |
---|
245 | 00|aAudit of business continuity planning |h[electronic resource]. |
---|
260 | |a[Ottawa] : |bVeterans Affairs Canada, |c2014. |
---|
300 | |ai, 5, [2] p. : |btables |
---|
500 | |aIssued also in French under title: Vérification de la planification de la continuité des opérations. |
---|
500 | |a“Final - July 2014.” |
---|
520 | |aBusiness Continuity Planning (BCP) involves the development and timely execution of plans, measures, procedures and arrangements to ensure minimal or no interruption to the availability of critical services and assets. Business continuity plans outline the strategies, resources, and procedures required to restore critical services to the public, as quickly and effectively as possible. The objective of this audit was to assess Veterans Affairs Canada’s compliance with Treasury Board requirements for BCP. The scope covered the status of BCP within the Department as at December 31, 2013. The audit team observed that a BCP process had been fully established at Veterans Affairs Canada. Audit results confirmed that the Department was complying with key requirements, although there is a need to update the departmental BCP policy and ensure that a business continuity plan is developed specifically for information technology. Overall, the audit team determined the results to be “Generally Acceptable”. |
---|
692 | 07|2gccst|aFederal departments |
---|
692 | 07|2gccst|aBusiness plans |
---|
692 | 07|2gccst|aAudit |
---|
710 | 1 |aCanada. |bVeterans Affairs Canada. |bAudit and Evaluation Division. |
---|
775 | 08|tVérification de la planification de la continuité des opérations |w(CaOODSP)9.814715 |
---|
856 | 40|qPDF|s206 KB|uhttps://publications.gc.ca/collections/collection_2016/acc-vac/V32-302-2014-eng.pdf |
---|