000 01803nam  2200277za 4500
0019.819856
003CaOODSP
00520221107143052
007cr |||||||||||
008160621s2010    onca||||o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aCC172-138/2010E-PDF
1102 |aCanadian Nuclear Safety Commission.
24510|aPreliminary survey of risk management audit report |h[electronic resource] / |cOffice of Audit and Ethics.
260 |a[Ottawa] : |bCanadian Nuclear Safety Commission, |c2010.
300 |aii, 13 p. : |bill.
500 |aCover title.
500 |a"July 2010".
500 |aIssued also in French under title: Étude préliminaire de la gestion du risque.
504 |aIncludes bibliographical references.
520 |a"The Canadian Nuclear Safety Commission’s (CNSC) 2009-2010 Risk-Based Audit Plan calls for a Preliminary Survey of Risk Management (RM). The preliminary survey was conducted by consultants, in conjunction with an Audit Manager at CNSC to determine the degree in which CNSC was implementing the Treasury Board of Canada Secretariat’s (TBS) Integrated Risk Management Framework (IRMF) and identify potential areas for management focus in moving RM forward within the organization. ... Based on the results of the preliminary survey, it is recommended that an audit of risk management be scheduled for inclusion in the CNSC Risk-Based Audit Plan, but given the pace of change related to RM in CNSC, it would not be appropriate to audit RM at this time."--p. i.
69207|2gccst|aRisk management
69207|2gccst|aAudit
77508|tÉtude préliminaire de la gestion du risque |w(CaOODSP)9.819857
85640|qPDF|s204 KB|uhttps://publications.gc.ca/collections/collection_2016/ccsn-cnsc/CC172-138-2010-eng.pdf