<?xml version="1.0" encoding="UTF-8"?><marc:collection xmlns:marc="http://www.loc.gov/MARC21/slim">
  <marc:record>
    <marc:leader>00000nam  2200000za 4500</marc:leader>
    <marc:controlfield tag="001">9.821311</marc:controlfield>
    <marc:controlfield tag="003">CaOODSP</marc:controlfield>
    <marc:controlfield tag="005">20240219183445</marc:controlfield>
    <marc:controlfield tag="007">cr |||||||||||</marc:controlfield>
    <marc:controlfield tag="008">160719s2011    onc|||||o    f000 0 eng d</marc:controlfield>
    <marc:datafield tag="040" ind1=" " ind2=" ">
      <marc:subfield code="a">CaOODSP</marc:subfield>
      <marc:subfield code="b">eng</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="041" ind1=" " ind2=" ">
      <marc:subfield code="a">eng</marc:subfield>
      <marc:subfield code="b">fre</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="043" ind1=" " ind2=" ">
      <marc:subfield code="a">n-cn---</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="086" ind1="1" ind2=" ">
      <marc:subfield code="a">D68-6/122-2011E-PDF</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="100" ind1="1" ind2=" ">
      <marc:subfield code="a">Ghanmi, Ahmed,</marc:subfield>
      <marc:subfield code="d">1965-</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="245" ind1="1" ind2="0">
      <marc:subfield code="a">Optimal RSOM-hub locations for northern operations </marc:subfield>
      <marc:subfield code="h">[electronic resource] : </marc:subfield>
      <marc:subfield code="b">a MAJAID scenario analysis / </marc:subfield>
      <marc:subfield code="c">by A. Ghanmi.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="260" ind1=" " ind2=" ">
      <marc:subfield code="a">[Ottawa] : </marc:subfield>
      <marc:subfield code="b">Defence Research and Development Canada, </marc:subfield>
      <marc:subfield code="c">c2011.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="300" ind1=" " ind2=" ">
      <marc:subfield code="a">xiii, 33 p. : </marc:subfield>
      <marc:subfield code="b">tables, graphs.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="490" ind1="1" ind2=" ">
      <marc:subfield code="a">Technical Memorandum ; </marc:subfield>
      <marc:subfield code="v">2011-122</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="500" ind1=" " ind2=" ">
      <marc:subfield code="a">"August 2011."</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="504" ind1=" " ind2=" ">
      <marc:subfield code="a">Includes bibliographical references.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="520" ind1=" " ind2=" ">
      <marc:subfield code="a">This paper presents an analysis of a Reception, Staging and Onward Movement hub (RSOM-hub) concept to support Canadian Forces Major Air Disaster (MAJAID) operations in the North and provides insights into the optimal RSOM-hub locations. RSOM-hubs are permanent or temporary staging bases for cross-loading between strategic and tactical lift during military deployment and sustainment operations. In this study, performance measures were formulated to assess the effectiveness and the responsiveness of different RSOM-hub options to support MAJAID deployments. A simulation-based optimization model was also developed to determine the optimal number and locations of hubs in the North. The model was considered in a multi-objective framework and solution trade-offs were determined through an exhaustive search methodology. An illustrative scenario and associated data were used to simulate deployment lift to various MAJAID locations and to demonstrate the methodology. Sensitivity analysis was conducted to examine the impact of different operational parameters on hub performance and optimal locations. The study indicated that the optimal number of RSOM-hubs for MAJAID operations in the North would be two, corresponding to Iqaluit and Yellowknife.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="692" ind1="0" ind2="7">
      <marc:subfield code="2">gccst</marc:subfield>
      <marc:subfield code="a">Technical reports</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="693" ind1="0" ind2="7">
      <marc:subfield code="a">Airlift</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="693" ind1="0" ind2="7">
      <marc:subfield code="a">Facility location</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="710" ind1="2" ind2=" ">
      <marc:subfield code="a">Defence R&amp;D Canada.</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="830" ind1="#" ind2="0">
      <marc:subfield code="a">Technical memorandum (Defence R&amp;D Canada)</marc:subfield>
      <marc:subfield code="v">2011-122</marc:subfield>
      <marc:subfield code="w">(CaOODSP)9.820564</marc:subfield>
    </marc:datafield>
    <marc:datafield tag="856" ind1="4" ind2="0">
      <marc:subfield code="q">PDF</marc:subfield>
      <marc:subfield code="s">734 KB</marc:subfield>
      <marc:subfield code="u">https://publications.gc.ca/collections/collection_2016/rddc-drdc/D68-6-122-2011-eng.pdf</marc:subfield>
    </marc:datafield>
  </marc:record>
</marc:collection>
