000 02058nam  2200313za 4500
0019.821320
003CaOODSP
00520240219183446
007cr |||||||||||
008160719s2012    onc|||||o    f000 0 eng d
040 |aCaOODSP|beng
041 |aeng|bfre
043 |an-cn---
0861 |aD68-6/126-2012E-PDF
1001 |aColey, Geoff.
24510|aMechanized neutralization technology demonstration project |h[electronic resource] : |bcompletion report / |cby Geoff Coley.
260 |a[Ottawa] : |bDefence Research and Development Canada, |cc2012.
300 |ax, 22 p. : |btables, graphs.
4901 |aTechnical Memorandum ; |v2012-126
500 |a"October 2012."
504 |aIncludes bibliographical references.
520 |aThe Mechanized Neutralization Technology Demonstration Project (12RN) was completed in March 2012. This project examined mechanized neutralization assets in-service with the Canadian Forces, or available to the Canadian Forces, and evaluated their potential for enhancing the survivability of Canadian Forces personnel in dealing with the explosive hazard threats of landmines, improvised explosive devices, unexploded ordnance, and the like. Through the Mechanized Neutralization Technology Demonstration Project, the Canadian Forces has been able to replace aging equipment with proven “best-in-class” alternatives. In-service equipment has been upgraded to enhance its performance. Survivability of equipment and personnel has been improved through more effective countermine / counter-IED effectiveness. The project improved the CF ability to make such decisions based on scientific evidence, objective data and quantified improvements in performance.
69207|2gccst|aTechnical reports
69307|aMechanized
69307|aNeutralization
69307|aLandmine
7102 |aDefence R&D Canada.
830#0|aTechnical memorandum (Defence R&D Canada)|v2012-126|w(CaOODSP)9.820564
85640|qPDF|s666 KB|uhttps://publications.gc.ca/collections/collection_2016/rddc-drdc/D68-6-126-2012-eng.pdf