000
| 02611nam 2200325za 4500 |
---|
001 | 9.821365 |
---|
003 | CaOODSP |
---|
005 | 20240219183448 |
---|
007 | cr ||||||||||| |
---|
008 | 160720s2011 onc|||||o f000 0 eng d |
---|
040 | |aCaOODSP|beng |
---|
041 | |aeng|bfre |
---|
043 | |an-cn--- |
---|
086 | 1 |aD68-6/194-2011E-PDF |
---|
100 | 1 |aOrmrod, Mike. |
---|
245 | 10|aAnalysis of the proposed implemenation of the new Army Communications and Information Systems Specialist (ACISS) trade using the Managed Readiness Simulator (MARS) |h[electronic resource] / |cby Mike Ormrod, Stephen Okazawa and Christine Scales. |
---|
260 | |a[Ottawa] : |bDefence Research and Development Canada, |cc2011. |
---|
300 | |axii, 42 p. : |btables, figures. |
---|
490 | 1 |aTechnical Memorandum ; |v2011-194 |
---|
500 | |a"November 2011." |
---|
504 | |aIncludes bibliographical references. |
---|
520 | |aThe Army is in the process of restructuring the Signals Non-Commissioned Members occupations to create a new Army Communication & Information Systems Specialist (ACISS) occupation by combining the current Land Communications and Information Systems Technician; Signal Operator; and Lineman occupations. In order to validate the complex ACISS structure concept and to optimize the implementation and sustainment of this new occupation, the Managed Readiness Simulator (MARS) program was used to conduct some population modelling analysis. The ACISS structure along with a proposed intake and training plan were successfully modelled in MARS for a 12 year period. Preliminary results showed that it would take approximately nine years to fill most of the vacant positions in the ACISS structure due to bottlenecks in the training system indicating that the proposed training plan was inadequate to support the proposed intake plan. Proposals to address these bottlenecks were then examined along with proposed reductions to the intake plan to prevent trained recruits from being unable to find a job in the ACISS structure. The result of the proposed changes was an ACISS structure filled in approximately half the time of the initial training proposal and one that allowed virtually all new recruits to find a position in the ACISS structure. |
---|
692 | 07|2gccst|aTechnical reports |
---|
693 | 4|aTraining plan |
---|
693 | 4|aIntake plan |
---|
700 | 1 |aOkazawa, Stephen. |
---|
700 | 1 |aScales, Christine. |
---|
710 | 2 |aDefence R&D Canada. |
---|
830 | #0|aTechnical memorandum (Defence R&D Canada)|v2011-194|w(CaOODSP)9.820564 |
---|
856 | 40|qPDF|s1.58 MB|uhttps://publications.gc.ca/collections/collection_2016/rddc-drdc/D68-6-194-2011-eng.pdf |
---|