245 | 10|a2010-711 follow-up audit of the management practices of PWGSC bridges and dams |h[electronic resource] : |bfinal report / |cOffice of Audit and Evaluation. |
---|
246 | 14|iCover title:|aFinal Report, 2010-711, follow-up audit of the management practices of PWGSC bridges and dams |
---|
260 | |a[Ottawa] : |bPublic Works and Government Services Canada, |c2012. |
---|
300 | |aiv, 20 p. |
---|
500 | |a"January 26, 2012." |
---|
500 | |aCaption title. |
---|
500 | |aIssued also in French under title: 2010-711 vérification de suivi des pratiques de gestion relatives aux ponts et aux barrages de TPSGC: rapport final. |
---|
520 | |a"At Public Works and Government Services Canada (PWGSC) bridges and dams are classified as engineering assets, which are defined as any land or marine assets for which PWGSC is the custodian. All of the engineering assets under the responsibility of the Engineering Assets Strategy Sector, PWGSC are managed as a portfolio. This portfolio includes 15 major engineering assets that meet the definition of bridges or dams to be preserved under the Real Property Branch Bridge Inspection and Evaluation Policy and the Real Property Branch Dam Inspection and Evaluation Policy. These 15 assets are complex and total 83 different structures (Appendix A)"--Main Points, p. i. |
---|
692 | 07|2gccst|aBridges |
---|
692 | 07|2gccst|aDams |
---|
692 | 07|2gccst|aProperty management |
---|
775 | 08|t2010-711 vérification de suivi des pratiques de gestion relatives aux ponts et aux barrages de TPSGC |w(CaOODSP)9.827066 |
---|
856 | 40|qPDF|s397 KB|uhttps://publications.gc.ca/collections/collection_2016/spac-pspc/P24-711-2010-eng.pdf |
---|