245 | 00|aSelf-healing grid case study |h[electronic resource] : |ba Canadian Smart Grid project. |
---|
246 | 10|aCanadian Smart Grid project |
---|
260 | |a[Ottawa?] : |bNatural Resources Canada, |c[2012?]. |
---|
300 | |a4 p. : |bill., photo |
---|
500 | |aTitle from caption. |
---|
520 | |a"The primary benefit of this project is reduced outage duration for customers on the non‐faulted sections of the faulted feeder. The Fault Detection Isolation & Restoration (FDIR) project facilitates supplying power for these customers from alternate feeders during a feeder fault and would leave the “faulted” section of the feeder isolated without power until PowerStream crews address the fault. It is estimated that the outage duration would be reduced by up to 15 minutes for customers on the non‐faulted sections of a feeder during a feeder fault through the FDIR project."--Objectives & Benefits. |
---|
692 | 07|2gccst|aHydropower |
---|
692 | 07|2gccst|aElectricity |
---|
710 | 1 |aCanada. |bNatural Resources Canada. |
---|
856 | 40|qPDF|s260 KB|uhttps://publications.gc.ca/collections/collection_2017/rncan-nrcan/M4-146-2012-eng.pdf |
---|