000 02188nam  2200313za 4500
0019.838734
003CaOODSP
00520221107151440
007cr |||||||||||
008170713s2017    oncd    ob   f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aYN5-123/2017E-PDF
1001 |aStory, Rod,|d1961-
24514|aThe cost of Canada’s surface combatants |h[electronic resource].
260 |aOttawa : |bOffice of the Parliamentary Budget Officer, |c2017.
300 |a56 p. : |bcol. charts
500 |aIssued also in French under title: Le coût des navires de combat canadiens.
500 |aCover title.
500 |a"1 June 2017."
500 |a"This report was prepared by the staff of the Parliamentary Budget Officer. Rod Story wrote the report”--Verso of cover.
504 |aIncludes bibliographical references.
520 |a“The objective of this report is to provide a cost estimate of the Department of National Defence’s (DND) Canadian Surface Combatant (CSC) program. This estimate includes costs resulting from development, production, spare parts, ammunition, training, government program management and upgrades to existing facilities. This report explains each of these items. The estimate does not include costs associated with the operation, maintenance and mid-life refurbishment of the ships other than the spare parts that will be purchased when the ships are built. The remainder of this report is divided into three sections. The first provides background information regarding the CSC program, surface combatants in general and important factors related to their construction. The second describes the primary estimation methodology as well as two other methodologies used to validate the results of the primary methodology. The final section outlines the results"--Introd., p. 5.
69207|2gccst|aFrigates
69207|2gccst|aCosts
69207|2gccst|aEstimates
7101 |aCanada. |bOffice of the Parliamentary Budget Officer.
77508|tLe coût des navires de combat canadiens |w(CaOODSP)9.838735
85640|qPDF|s548 KB|uhttps://publications.gc.ca/collections/collection_2017/dpb-pbo/YN5-123-2017-eng.pdf