000 01586cam  2200325za 4500
0019.840523
003CaOODSP
00520221107151850
007cr |||||||||||
008170727s1984    onc    |o    f|0| 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aCS11-617/85-47E-PDF
24500|aBusiness Survey Redesign Project |h[electronic resource] : |bphase I - infrastructure development, objectives, policies and strategy / |cM. Colledge ... [et al.].
260 |a[Ottawa] : |bStatistics Canada, |c1984.
300 |a39 p.
4901 |aWorking paper ; |v85-47
500 |aDigitized edition from print [produced by Statistics Canada].
500 |a"Working Paper No. BSMD 85-047E."
500 |a"November, 1984."
504 |aIncludes bibliographic references.
520 |a"The objectives of the strategy are to achieve, at lowest cost, the development and provision of facilities for data integration; to ensure comprehensive and non-duplicative coverage; and to foster the replacement of business units reporting through direct survey by comparable information gathered from administrative sources"--Executive Summary.
69207|2gccst|aMethodology
69207|2gccst|aStatistical analysis
69207|2gccst|aSurveys
7001 |aColledge, M.
7101 |aCanada. |bStatistics Canada. |bMethodology Branch.
830#0|aWorking paper (Statistics Canada. Methodology Branch)|v85-47|w(CaOODSP)9.834763
85640|qPDF|s3.23 MB|uhttps://publications.gc.ca/collections/collection_2017/statcan/11-613/CS11-617-85-47-eng.pdf