00000000nam 2200000za 4500
0019.846560
003CaOODSP
00520221107153230
007cr |||||||||||
008180329s1991    qucbdo||o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn-sn
086 |aEn106-168/1991E-PDF
24500|aRafferty-Alameda Project |h[electronic resource] : |breport of the Environmental Assessment Panel.
260 |aHull, Quebec : |bFederal Environmental Assessment Review Office, |c1991.
300 |a67 p. : |bphotos, maps, charts
500 |aIssued also in French under title: Projet Rafferty-Alameda.
500 |a"September 1991."
500 |aDigitized edition from print [produced by Canadian Environmental Assessment Agency].
504 |aIncludes bibliographic references.
520 |a"The Project consists of two large earth-filled dams and associated structures in the Souris River basin in southeastern Saskatchewan. Rafferty Dam is located on the Souris River to the west of Estevan, and the Alameda Dam is on Moose Mountain Creek near the Town of Oxbow. The reservoirs to be created by these dams represent a five-fold increase in surface water storage capacity in the basin. This storage is intended to provide flood control for Saskatchewan and North Dakota, to supply cooling water for a new thermal power generation facility, to supply water for irrigation and to create new water-based recreation opportunities"--Exec. Summary, p. 1.
69207|2gccst|aWater management
69207|2gccst|aDams
7101 |aCanada. |bCanadian Environmental Assessment Agency.
7101 |aCanada. |bEnvironmental Assessment Panel.
77508|tProjet Rafferty-Alameda |w(CaOODSP)9.854601
85640|qPDF|s4.01 MB|uhttps://publications.gc.ca/collections/collection_2018/acee-ceaa/En106-168-1991-eng.pdf