000 01366nam  2200265za 4500
0019.846605
003CaOODSP
00520221107153237
007cr |||||||||||
008180416s2013    onc    |o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aM159-12/2013E-PDF
24500|aProject Pioneer Front End Engineering & Design (FEED) study |h[electronic resource] / |c[Office of Energy Research and Development].
250 |aRevised March 2013.
260 |a[Ottawa : |bOffice of Energy Research and Development], |c2013.
300 |a[1] p.
500 |aIssued also in French under title: Étude d’ingénierie de base pour le projet Pioneer.
520 |a"The project, owned by TransAlta, Capital Power L.P. and Enbridge Inc., entailed the completion of a Front End Engineering & Design (FEED) Study for a large-scale carbon capture & storage (CCS) facility to be retrofitted onto the Keephills 3 coal-fired power plant"--Project description.
69207|2gccst|aGreenhouse gases
69207|2gccst|aElectricity
7101 |aCanada. |bNatural Resources Canada.
7101 |aCanada.|bOffice of Energy Research and Development.
77508|tÉtude d’ingénierie de base pour le projet Pioneer |w(CaOODSP)9.855312
85640|qPDF|s708 KB|uhttps://publications.gc.ca/collections/collection_2018/rncan-nrcan/m159/M159-12-2013-eng.pdf