000 01731nam  2200289za 4500
0019.846609
003CaOODSP
00520221107153238
007cr |||||||||||
008180501s2013    onc    |o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn-ab
0861 |aM159-15/2013E-PDF
24500|aIGCC Front End Engineering Design study |h[electronic resource] / |c[Office of Energy Research and Development].
260 |a[Ottawa : |bOffice of Energy Research and Development], |c2013.
300 |a[1] p.
500 |aIssued also in French under title: Étude de l’ingénierie de base pour le cycle combiné à gazéification intégrée.
500 |aCaption title.
500 |a"Revised March 2013."
520 |a"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.
69207|2gccst|aElectric power stations
69207|2gccst|aGreenhouse gases
693 4|aCarbon dioxide capture
7101 |aCanada. |bNatural Resources Canada.
7101 |aCanada.|bOffice of Energy Research and Development.
77508|tÉtude de l’ingénierie de base pour le cycle combiné à gazéification intégrée |w(CaOODSP)9.856006
85640|qPDF|s690 KB|uhttps://publications.gc.ca/collections/collection_2018/rncan-nrcan/m159/M159-15-2013-eng.pdf