The Ontario wall drying project : phase 2 / prepared for Canada Mortgage and Housing Corporation [by] E.F.P. Burnett.: NH17-210/1993E-PDF
"Over a 24-month period spanning 1989/90/91, a study of the drying performance of various wall systems was carried out by the Building Engineering Group. The primary objective was to obtain a broader and better understanding of the moisture-related performance of various house wall assemblies constructed with wet/green (above 19%moisture content) framing lumber. ... The primary objective in the second phase was to monitor and assess wall system performance over at least one winter, one swing period (spring or fall), and one summer. As in Phase I, variation in the moisture content in the framing lumber was of primary concern:--Summary, p. [vii].
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.846780&sl=0
| Department/Agency |
|
|---|---|
| Title | The Ontario wall drying project : phase 2 / prepared for Canada Mortgage and Housing Corporation [by] E.F.P. Burnett. |
| Publication type | Monograph |
| Language | [English] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Author / Contributor |
|
| Description | [vii], 20, [95] p. : ill., charts |
| Catalogue number |
|
| Subject terms |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: