000 01839cam  2200313za 4500
0019.848194
003CaOODSP
00520221107153621
007cr |||||||||||
008171201s1969    abcbd  #ob   f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn-ab
0861 |aR39-37/1969E-PDF
24502|aA land use and socio-economic study of the Pigeon Lake Indian Reserve No. 138A and summary report of the Hobbema Reserve group |h[electronic resource] / |cprepared for the Department of Indian Affairs and Northern Development by Stanley Associates Engineering Ltd.
24610|aPigeon Lake Indian Reserve No. 138A
24610|aSummary report of the Hobbema Reserve group
24614|aHobbema
260 |aEdmonton, Alberta : |bDepartment of Indian Affairs and Northern Development, |c1969.
300 |aiv, 124, 9 p. : |bmaps, graphs
500 |aDigitized edition from print [produced by Indigenous and Northern Affairs Canada].
504 |aIncludes bibliographical references.
520 |a"This report is presented in two parts. Part I deals with the Pigeon Lake Reserve No. 138A which is controlled by the Four Bands comprising the Hobbema Group of Reserves. Part II deals with the overall social and physical development of the Hobbema Reserves, with emphasis upon those areas of development which are common to all of the Reserves, mainly industrial and commercial development and the concept of a Four Band Urban Development at Hobbema"--Introduction, p. [v].
69207|2gccst|aAboriginal reserves
69207|2gccst|aLand management
69207|2gccst|aSocial development
7102 |aStanley Associates Engineering.
7101 |aCanada. |bIndian and Northern Affairs Canada.
85640|qPDF|s20.17 MB|uhttps://publications.gc.ca/collections/collection_2018/aanc-inac/R39-37-1969-eng.pdf