000
| 01839nam 2200313za 4500 |
---|
001 | 9.848194 |
---|
003 | CaOODSP |
---|
005 | 20221107153621 |
---|
007 | cr ||||||||||| |
---|
008 | 171201s1969 abcbd #ob f000 0 eng d |
---|
040 | |aCaOODSP|beng |
---|
043 | |an-cn-ab |
---|
086 | 1 |aR39-37/1969E-PDF |
---|
245 | 02|aA land use and socio-economic study of the Pigeon Lake Indian Reserve No. 138A and summary report of the Hobbema Reserve group |h[electronic resource] / |cprepared for the Department of Indian Affairs and Northern Development by Stanley Associates Engineering Ltd. |
---|
246 | 10|aPigeon Lake Indian Reserve No. 138A |
---|
246 | 10|aSummary report of the Hobbema Reserve group |
---|
246 | 14|aHobbema |
---|
260 | |aEdmonton, Alberta : |bDepartment of Indian Affairs and Northern Development, |c1969. |
---|
300 | |aiv, 124, 9 p. : |bmaps, graphs |
---|
500 | |aDigitized edition from print [produced by Indigenous and Northern Affairs Canada]. |
---|
504 | |aIncludes bibliographical references. |
---|
520 | |a"This report is presented in two parts. Part I deals with the Pigeon Lake Reserve No. 138A which is controlled by the Four Bands comprising the Hobbema Group of Reserves. Part II deals with the overall social and physical development of the Hobbema Reserves, with emphasis upon those areas of development which are common to all of the Reserves, mainly industrial and commercial development and the concept of a Four Band Urban Development at Hobbema"--Introduction, p. [v]. |
---|
692 | 07|2gccst|aAboriginal reserves |
---|
692 | 07|2gccst|aLand management |
---|
692 | 07|2gccst|aSocial development |
---|
710 | 2 |aStanley Associates Engineering. |
---|
710 | 1 |aCanada. |bIndian and Northern Affairs Canada. |
---|
856 | 40|qPDF|s20.17 MB|uhttps://publications.gc.ca/collections/collection_2018/aanc-inac/R39-37-1969-eng.pdf |
---|