000 01921nam  2200349za 4500
0019.857221
003CaOODSP
00520240209130843
007cr |||||||||||
008180531s1995    oncd   #ob   f000 0 eng d
040 |aCaOODSP|beng
041 |aeng|bfre
043 |an-cn---
0861 |aNH17-237/1995E-PDF
1001 |aReardon, J.T. |q(James Thomas), |d1954-
24510|aVentilation systems for new and existing houses with baseboard heating |h[electronic resource] / |cAuthor James T. Reardon.
260 |aOttawa : |bCanada Mortgage and Housing Corporation : |bInstitute for Research in Construction, |c1995.
300 |a1 v. (various pagings) : |bgraphs
500 |a"8 December 1995."
500 |a"Approved: Building Performance Laboratory."
500 |aAt head of cover title: NRC-CNRC client report, A-3527.1 Revised.
500 |aDigitized edition from print [produced by Canada Mortgage and Housing Corporation].
504 |aIncludes bibliographical references.
520 |a"Adequate ventilation is essential in houses to ensure acceptable indoor air quality and to control condensation. In Canada, the measure of adequate ventilation in a house will be compliance with the Canadian standard CAN/CSA-F326-M91 “Residential Mechanical Ventilation Systems”, which specifies the minimum outdoor air change rate for the entire house as well as ventilation rates to individual rooms to ensure adequate air distribution within the house"--Abstract, p. iii.
546 |aIncludes abstract in French.
69207|2gccst|aHeating
69207|2gccst|aHousing
69207|2gccst|aAir quality
7102 |aInstitute for Research in Construction (Canada)
7102 |aBuilding Performance Laboratory (Canada)
7102 |aCanada Mortgage and Housing Corporation.
85640|qPDF|s4.21 MB|uhttps://publications.gc.ca/collections/collection_2018/schl-cmhc/nh17/NH17-237-1995-eng.pdf