000 02001cam  2200325zi 4500
0019.858898
003CaOODSP
00520221107160121
006m     o  d f      
007cr mn|||||||||
008180711e20180621oncab   ob   f000 0 eng d
020 |a9780660272214
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-on
0861 |aW93-44/2018E-PDF
24500|aOttawa River south shore riverfront park plan.
264 1|aOttawa, Canada : |bNational Capital Commission = Commission de la capitale nationale, |cJune 21, 2018.
300 |a1 online resource (v, 139 pages) : |billustrations (chiefly colour), colour maps
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aIssued also in French under title: Plan du parc riverain de la berge sud de la rivière des Outaouais.
504 |aIncludes bibliographical references.
520 |a"In 2014, the National Capital Commission (NCC) launched a process to reimagine and transform the riverfront lands adjacent to the Sir John A. Macdonald Parkway to create an iconic Capital park. This plan creates a continuous riverfront park that contributes to environmental sustainability, is attractive and resilient, and enhances the recreational experience. Based on extensive consultations with local residents, Indigenous communities and stakeholders, the plan will connect communities to the nine kilometres of riverfront lands between LeBreton Flats and Mud Lake Conservation Area"--Provided by publisher.
650 0|aWaterfronts|zOntario|zOttawa|xPlanning.
650 0|aParks|zOntario|zOttawa|xPlanning.
650 0|aParks|zOttawa River (Québec and Ont.)|xPlanning.
7101 |aCanada. |bNational Capital Commission, |eissuing body.
77508|tPlan du parc riverain de la berge sud de la rivière des Outaouais.|w(CaOODSP)9.858900
85640|qPDF|s37.42 MB|uhttps://publications.gc.ca/collections/collection_2022/ccn-ncc/W93-44-2018-eng.pdf