000 01773nam  2200313za 4500
0019.861544
003CaOODSP
00520221107160802
007cr |||||||||||
008180905s1969    oncbd|||o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn-bc
0861 |aEn36-515/18E-PDF
1001 |aCoulson, A.
24514|aThe effects of the W.A.C. Bennett Dam on downstream levels and flows |h[electronic resource] / |cA. Coulson and R.J. Adamcyk.
260 |aOttawa : |bDept. of Energy, Mines and Resources, Inland Waters Branch, |c1969.
300 |avi, 9 p. : |bmap, charts.
4901 |aTechnical bulletin - Inland Waters Branch ; |vno. 18
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
520 |a"Construction of the W.A.C. Bennett Dam on the Peace River in British Columbia was completed in 1968 as an integral part of the Province's power development program. The filling of the reservoir (Williston Lake) behind the dam began in December 1967, in advance of the dam's completion .This report summarizes the effects that the dam is expected to have on levels and flows in the Mackenzie River basin once the power development is in full operation and the estimated effects of the partial filling of the reservoir during 1968"--Pref.
69207|2gccst|aStreams
69207|2gccst|aMeasurement
7001 |aAdamcyk, R. J.
7101 |aCanada. |bEnvironment Canada.
7101 |aCanada. |bInland Waters Branch.
7101 |aCanada. |bDepartment of Energy, Mines and Resources.
830#0|aTechnical bulletin (Canada. Inland Waters Branch)|vno. 18|w(CaOODSP)9.861115
85640|qPDF|s641 KB|uhttps://publications.gc.ca/collections/collection_2018/eccc/En36-515-18-eng.pdf