000
| 01773nam 2200313za 4500 |
---|
001 | 9.861544 |
---|
003 | CaOODSP |
---|
005 | 20221107160802 |
---|
007 | cr ||||||||||| |
---|
008 | 180905s1969 oncbd|||o f000 0 eng d |
---|
040 | |aCaOODSP|beng |
---|
043 | |an-cn-bc |
---|
086 | 1 |aEn36-515/18E-PDF |
---|
100 | 1 |aCoulson, A. |
---|
245 | 14|aThe effects of the W.A.C. Bennett Dam on downstream levels and flows |h[electronic resource] / |cA. Coulson and R.J. Adamcyk. |
---|
260 | |aOttawa : |bDept. of Energy, Mines and Resources, Inland Waters Branch, |c1969. |
---|
300 | |avi, 9 p. : |bmap, charts. |
---|
490 | 1 |aTechnical bulletin - Inland Waters Branch ; |vno. 18 |
---|
500 | |aDigitized edition from print [produced by Environment and Climate Change Canada]. |
---|
520 | |a"Construction of the W.A.C. Bennett Dam on the Peace River in British Columbia was completed in 1968 as an integral part of the Province's power development program. The filling of the reservoir (Williston Lake) behind the dam began in December 1967, in advance of the dam's completion .This report summarizes the effects that the dam is expected to have on levels and flows in the Mackenzie River basin once the power development is in full operation and the estimated effects of the partial filling of the reservoir during 1968"--Pref. |
---|
692 | 07|2gccst|aStreams |
---|
692 | 07|2gccst|aMeasurement |
---|
700 | 1 |aAdamcyk, R. J. |
---|
710 | 1 |aCanada. |bEnvironment Canada. |
---|
710 | 1 |aCanada. |bInland Waters Branch. |
---|
710 | 1 |aCanada. |bDepartment of Energy, Mines and Resources. |
---|
830 | #0|aTechnical bulletin (Canada. Inland Waters Branch)|vno. 18|w(CaOODSP)9.861115 |
---|
856 | 40|qPDF|s641 KB|uhttps://publications.gc.ca/collections/collection_2018/eccc/En36-515-18-eng.pdf |
---|