24500|aRed Mountain underground gold project : |benvironmental assessment report.
264 1|a[Ottawa] : |bCanadian Environmental Assessment Agency = Agence canadienne d'évaluation environnementale, |c2019.
264 4|c©2019
300 |a1 online resource (viii, 213 pages) : |bmaps
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aIssued also in French under title: Projet de mine d'or souterraine Red Mountain : rapport d'évaluation environnementale.
500 |aCover title.
500 |a"December 2018."
504 |aIncludes bibliographical references.
520 |a"IDM Mining Ltd. (the proponent) proposes to construct, operate, and decommission an underground gold and silver mine located approximately 15 kilometres northeast of Stewart in northwestern British Columbia (B.C.). The Red Mountain Underground Gold Project (the Project) would include an underground mine, laydown areas, temporary waste rock storage area, temporary ore stockpiles, water management structures, tailings management facility, access and haul roads, and a powerline. The Project would have a year-round production rate of 1,000 tonnes per day or 365,000 tonnes per year over a mine life of six years. The Project is estimated to have an above ground disturbance footprint of 247 hectares"--Executive summary, page i.
69207|2gccst|aMining industry
69207|2gccst|aEnvironmental impact assessment
7101 |aCanada. |bCanadian Environmental Assessment Agency.
77508|tProjet de mine d'or souterraine Red Mountain : |w(CaOODSP)9.865430
85640|qPDF|s4.84 MB|uhttps://publications.gc.ca/collections/collection_2019/acee-ceaa/En106-215-2019-eng.pdf