245 | 00|aCost reduction study for a SARSAT 406 MHz emergency beacon / |cprepared by: Bristol Aerospace Limited, Engineering Division, Marketing/Contracts Department. |
---|
264 | 0|aOttawa, Canada : |bDepartment of Communications, Space Program, |c17 February 1984. |
---|
264 | 1|aWinnipeg, Canada : |bBristol Aerospace Limited |
---|
300 | |a1 online resource (122 pages in various pagings) : |billustrations. |
---|
336 | |atext|btxt|2rdacontent |
---|
337 | |acomputer|bc|2rdamedia |
---|
338 | |aonline resource|bcr|2rdacarrier |
---|
490 | 1 |aDOC contractor report ; |vDOC-CR-84-016 |
---|
500 | |a"Issued by contractor as report no: ER 84658." |
---|
500 | |aDigitized copy from print [produced by Innovation, Science and Economic Development Canada]. |
---|
504 | |aIncludes bibliographical references. |
---|
520 | |a"This engineering report presents a study performed to fulfill the requirements of contract 135 V, 36001-3-2165 "Conceptual Design Study - Reduced Cost SARSAT 406 MHz Emergency Beacon". The scope of this report is confined to analyzing methods and the impact of each to reduce the production cost of the electronics module developed by Bristol Aerospace Limited for experimental 406 MHz beacons. These methods are restricted to design changes of the electronics module and its enclosure. The design changes are initiated by either a system specification change or by modification of a design concept. The costs presented in this report are sufficiently accurate for relative cost comparisons but are not intended as an offer to manufacture or to be construed as an indication of selling price. They have been formulated on a premise that an appropriate facility would be used for production. The costs do not include any estimates for amortization of capital expenditures"--Introduction, page 1. |
---|
692 | 07|2gccst|aEmergency preparedness |
---|
692 | 07|2gccst|aCommunications equipment |
---|
692 | 07|2gccst|aCost benefit analysis |
---|
710 | 1 |aCanada. |bDepartment of Communications. |bSpace Program. |
---|
710 | 2 |aBristol Aerospace Limited. |
---|
830 | #0|aDOC contractor report (Canada. Department of Communications)|vDOC-CR-84-016.|w(CaOODSP)9.869864 |
---|
856 | 40|qPDF|s5.13 MB|uhttps://publications.gc.ca/collections/collection_2019/isde-ised/Co24/Co24-3-1-84-016-eng.pdf |
---|