000 01971cam  2200397zi 4500
0019.873330
003CaOODSP
00520221107163902
006m     o  d f      
007cr bn|||||||||
008190521e198905##onca    ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
041 |aeng|bfre
043 |an-cn-on
0861 |aEn13-5/89-17E-PDF
1001 |aCoakley, J. P. |eauthor.|q(John Phillip), |d1940-
24510|aNearshore bedload and suspended sediment transport in the vicinity of the Pickering Nuclear Generation Station, Lake Ontario / |cJ.P. Coakley and N.A. Rukavina.
264 1|aBurlington, Ontario : |bLakes Research Branch, National Water Research Institute, Canada Centre for Inland Waters, |cMay 1989.
300 |a1 online resource (17, [49] pages) : |billustrations.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aNWRI contribution ; |vno. 89-17
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
504 |aIncludes bibliographical references (page 17).
5203 |a"This report was prepared at the request of the Geotechnical and Hydraulic Engineering Department of Ontario Hydro to assist Hydro in decisions regarding developments to its cooling water intake system, including possible re-location"--Management perspective.
546 |aIncludes management perspective and abstract in French.
69207|2gccst|aSediments
69207|2gccst|aWater management
7001 |aRukavina, N. A., |eauthor.
7101 |aCanada. |bEnvironment Canada.
7102 |aNational Water Research Institute (Canada). |bLakes Research Branch.
7102 |aCanada Centre for Inland Waters.
830#0|aNWRI contribution ;|vno. 89-17.|w(CaOODSP)9.844121
85640|qPDF|s4.81 MB|uhttps://publications.gc.ca/collections/collection_2019/eccc/en13-5/En13-5-89-17-eng.pdf