000 01625cam  2200385zi 4500
0019.873544
003CaOODSP
00520221107163938
006m     o  d f      
007cr bn|||||||||
008190524s1996    onca    ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-on
0861 |aEn13-5/96-50E-PDF
1001 |aLapcevic, P. A., |eauthor.
24510|aPreliminary results of the fall 1995 drilling and hydraulic testing program at the Smithville phase IV bedrock remediation site / |cP. Lapcevic, K. Novakowski, G. Bickerton and J. Voralek.
264 1|aBurlington, ON : |bGroundwater Remediation Project, National Water Research Institute, |c1996.
300 |a1 online resource (v, 31 pages, 5 unnumbered pages) : |billustrations.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aNWRI contribution ; |v96-50
500 |a"January 8, 1996."
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
504 |aIncludes bibliographical references.
69207|2gccst|aGroundwater
69207|2gccst|aWater pollution
7001 |aNovakowski, Kent S., |eauthor.
7001 |aBickerton, Gregory S., |eauthor.
7001 |aVoralek, John, |eauthor.
7101 |aCanada. |bEnvironment Canada.
7102 |aNational Water Research Institute (Canada)
830#0|aNWRI contribution ;|v96-50.|w(CaOODSP)9.844121
85640|qPDF|s2.78 MB|uhttps://publications.gc.ca/collections/collection_2019/eccc/en13-5/En13-5-96-50-eng.pdf