000
| 02849nam 2200361zi 4500 |
---|
001 | 9.874477 |
---|
003 | CaOODSP |
---|
005 | 20221107164214 |
---|
006 | m o d f |
---|
007 | cr cn||||||||| |
---|
008 | 190607e20190603oncab ob f000 0 eng d |
---|
020 | |a9780660312682 |
---|
040 | |aCaOODSP|beng|erda|cCaOODSP |
---|
043 | |an-cn-mb|an-cn--- |
---|
086 | 1 |aM4-186/2019E-PDF |
---|
245 | 00|aConsultation and accommodation report for the Manitoba-Minnesota Transmission Project (Manitoba Hydro) (EH-001-2017) / |cprepared by the Major Projects Management Office. |
---|
264 | 1|a[Ottawa] : |b[Natural Resources Canada], |cJune 3, 2019. |
---|
300 | |a1 online resource (95 pages) : |bcolour illustration, colour maps |
---|
336 | |atext|btxt|2rdacontent |
---|
337 | |acomputer|bc|2rdamedia |
---|
338 | |aonline resource|bcr|2rdacarrier |
---|
500 | |aCover title. |
---|
500 | |aIssued also in French under title: Rapport sur la consultation et l'accommodement pour le Projet de ligne de transmission Manitoba-Minnesota (Manitoba Hydro) (EH-001-2017). |
---|
504 | |aIncludes bibliographical references. |
---|
520 | |a"The Government of Canada, through the MPMO of NRCan as "the Crown", has prepared this Crown Consultation and Accommodation Report (CCAR). This report documents the Crown's consultation with 21 Indigenous groups, including any potential accommodation measures, with respect to the potential impacts of the Manitoba-Minnesota Transmission Project on section 35 Aboriginal and Treaty rights. To this end, the CCAR: describes the consultation process undertaken by the Crown with Indigenous groups; reports the views of Indigenous groups on how the Crown conduct may potentially impact section 35 Aboriginal and Treaty rights; explains the Crown's assessment regarding the potential impacts of the Crown conduct on section 35 Aboriginal and Treaty rights; outlines accommodation measures proposed by Indigenous groups to address potential impacts on section 35 Aboriginal and Treaty rights; presents the Crown's response to each accommodation measure; and presents the Crown's overall conclusion on the adequacy of consultation and whether the duty to consult was fulfilled"--Introduction, pages 5-6. |
---|
650 | 0|aElectric lines|zManitoba. |
---|
650 | 0|aIndigenous peoples|zCanada|xGovernment relations. |
---|
650 | 0|aIndigenous peoples|zManitoba|xGovernment relations. |
---|
650 | 0|aIndigenous peoples|xCivil rights|zCanada. |
---|
650 | 0|aIndigenous peoples|xCivil rights|zManitoba. |
---|
710 | 1 |aCanada. |bNatural Resources Canada, |eissuing body. |
---|
775 | 08|tRapport sur la consultation et l'accommodement pour le Projet de ligne de transmission Manitoba-Minnesota (Manitoba Hydro) (EH-001-2017) / |w(CaOODSP)9.874478 |
---|
856 | 40|qPDF|s2.13 MB|uhttps://publications.gc.ca/collections/collection_2021/rncan-nrcan/M4-186-2019-eng.pdf |
---|