000
| 01996cam 2200361zi 4500 |
---|
001 | 9.881134 |
---|
003 | CaOODSP |
---|
005 | 20221107165949 |
---|
006 | m o d f |
---|
007 | cr |n||||||||| |
---|
008 | 191024t20182018quc ob f000 0 eng d |
---|
040 | |aCaOODSP|beng|erda|cCaOODSP |
---|
043 | |an-cn--- |
---|
086 | 1 |aD68-2/214-2018E-PDF |
---|
100 | 1 |aBerger, Jean, |eauthor. |
---|
245 | 10|aMulti-satellite intelligence collection scheduling : |bdecision model / |cJean Berger. |
---|
264 | 1|aQuébec (Québec) : |bDefence Research and Development Canada = Recherche et développement pour la défense Canada, |c2018. |
---|
264 | 4|c©2018 |
---|
300 | |a1 online resource (iv, 27 pages) |
---|
336 | |atext|btxt|2rdacontent |
---|
337 | |acomputer|bc|2rdamedia |
---|
338 | |aonline resource|bcr|2rdacarrier |
---|
490 | 1 |aScientific report ; |vDRDC-RDDC-2018-R214 |
---|
500 | |aCover title. |
---|
500 | |a"Can unclassified." |
---|
500 | |a"November 2018." |
---|
504 | |aIncludes bibliographical references (pages 23-26). |
---|
520 | 3 |a"Under the DRDC Joint Intelligence Collection and Analysis Capability (JICAC) project, this report proposes a formal multi-satellite intelligence collection scheduling deterministic decision model. A detailed description of the optimization model highlighting novelties is given. The underlying mathematical formulation is a mixed-integer quadratic programming model mapping intelligence requests to collection asset imaging opportunities in order to optimize collection value (value of information), subject to a variety of novel task, opportunity, capacity, temporal and cost constraints"--Abstract. |
---|
692 | 07|2gccst|aMilitary technology |
---|
692 | 07|2gccst|aSatellites |
---|
710 | 1 |aCanada. |bDefence R&D Canada. |bValcartier Research Centre. |
---|
830 | #0|aScientific report (Defence R&D Canada)|vDRDC-RDDC-2018-R214.|w(CaOODSP)9.802305 |
---|
856 | 40|qPDF|s1.72 MB|uhttps://publications.gc.ca/collections/collection_2019/rddc-drdc/D68-2-214-2018-eng.pdf |
---|