Operational performance of the Tsulquate sewage treatment plant and the airport sewage treatment plant at Port Hardy / by A. David.: En40-240-1/87-03E-PDF
"The Tsulquate and the Airport Sewage Treatment Plants were evaluated over a 5-day period from June 9 to June 14, 1986. The plants were last evaluated in December 1978 as part of a shellfish survey of Hardy Bay and Beaver Harbour (EPS Regional Program Report 79-18). In 1978, operational problems were found at the Tsulquate STP mainly due to the contact stabilization mode of operation and the large flows during wet weather. In 1982, the mode of operation was changed from contact stabilization to extended aeration allowing easier control for the STP operator. Since 1978, the Department of Highway's facilities, the homes along Beaver Harbour and the Fort Rupert Indian Reserve have connected to the Airport STP creating a larger load on the plant. This report represents an assessment of the treatment plants under the above modified conditions. Recommendations are made to improve the final effluent quality and to protect the fishery resources in the Port Hardy coastal waters"--Abstract, page i.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.881950&sl=0
| Department/Agency |
|
|---|---|
| Title | Operational performance of the Tsulquate sewage treatment plant and the airport sewage treatment plant at Port Hardy / by A. David. |
| Series title |
|
| Publication type | Monograph - View Master Record |
| Language | [English] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Author / Contributor |
|
| Description | 1 online resource (vi, 22 pages) : illustrations, map. |
| Catalogue number |
|
| Subject terms |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: