Operating, maintenance, repair and cost experience for a controlled air municipal incinerator / Allan M. McCrae, consulting civil engineer.: En40-913/1979E-PDF
"The performance of a 12 ton per day solid waste incinerator over a four year period is described. A factory built controlled air incinerator was installed near the village of Lake Cowichan, B.C. in 1975 to burn the municipal refuse from a population of 7,000 persons. Information is presented on refuse quantities processed, operating methods developed by the owner, auxiliary fuel consumption, maintenance and repair experience, and annual and unit costs"--Abstract, page ii.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.889545&sl=0
| Department/Agency |
|
|---|---|
| Title | Operating, maintenance, repair and cost experience for a controlled air municipal incinerator / Allan M. McCrae, consulting civil engineer. |
| Publication type | Monograph |
| Language | [English] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Author / Contributor |
|
| Description | 1 online resource (vi, 60 pages) : illustrations, maps, graphs |
| Catalogue number |
|
| Subject terms |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: