000 02087cam  2200337zi 4500
0019.895269
003CaOODSP
00520221107173959
006m     o  d f      
007cr |n|||||||||
008201008s1980    sncdb   ob   f|0| 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-mb
0861 |aEn37-215/1980E-PDF
1001 |aFoerstel, Hans,|d1935- |eauthor.
24510|aBenefit-cost analysis improved flood forecasting system : |b1. Boyne River Pilot Project ; 2. Red, Assiniboine and Souris Rivers under the Canada-Manitoba agreement respecting flood forecasting / |cprepared by Hans Foerstel, Hasu Naik.
264 1|aRegina, Saskatchewan : |bEnvironment Canada, Western and Northern Region, Inland Waters Directorate, Water Planning and Management Branch, |c1980.
300 |a1 online resource (iv, 37 pages) : |bcharts, map
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
500 |a"February 1980."
504 |aIncludes bibliographical references (pages 20-22).
520 |a""An Agreement Respecting Flood Forecasting" is being negotiated between Canada and Manitoba, in general support of the Canada-Manitoba Flood Damage Reduction Program started in 1978. The following benefit-cost analysis is intended to determine the economic feasibility of the two projects proposed under the agreement: the Boyne River Pilot Project, and improvements to the flood forecasting system for the Red, Assiniboine and Souris Rivers"--Introduction, page 1.
650 0|aFlood forecasting|zManitoba|xCost effectiveness.
650 6|aInondations|xPrévision|zManitoba|xCoût-efficacité.
7101 |aCanada. |bInland Waters Directorate. |bWater Planning and Management Branch, |eissuing body.
7101 |aCanada. |bEnvironment Canada, |eissuing body.
85640|qPDF|s1.22 MB|uhttps://publications.gc.ca/collections/collection_2021/eccc/en37/En37-215-1980-eng.pdf