000 01769cam  2200337zi 4500
0019.917832
003CaOODSP
00520221201091649
006m     o  d f      
007cr cn|||||||||
008221130e200912##onca    o    f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn---
0861 |aW93-59/1A-2009E-PDF
24500|aGreenbelt master plan review : |bconsultation report : phase 1, step A : existing conditions, issues and opportunities / |cprepared for the National Capital Commission by SENES Consultants Limited.
24637|aGreenbelt master plan existing conditions, issues and opportunities consultation report - December 2009
264 1|a[Ottawa] : |bNCC=CCN, |cDecember 2009.
300 |a1 online resource (1 volume in various pagings) : |billustrations
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aCover title.
500 |aIssued also in French under title: Ceinture de verdure révision du plan directeur : rapport de consultation : phase 1 - étape A, conditions actuelles, enjeux et opportunités.
546 |aIncludes some text in French.
650 5|aGreenbelts|zNational Capital Region (Ont. and Québec)|xPlanning.
650 0|aSustainable urban development|zNational Capital Region (Ont. and Québec)
650 0|aMultiple use management areas|zNational Capital Region (Ont. and Québec)
7101 |aCanada. |bNational Capital Commission, |eissuing body.
7102 |aSENES Consultants Limited, |econsultant.
77508|tCeinture de verdure, révision du plan directeur : |w(CaOODSP)9.917831
85640|qPDF|s2.27 MB|uhttps://publications.gc.ca/collections/collection_2022/ccn-ncc/W93-59-1A-2009-eng.pdf