1102 |aCanada Energy Regulator.|eauthor, |eissuing body.
24510|aCanada Energy Regulator reasons for decision in the matter of TransCanada Keystone Pipeline GP Ltd. : |bcomplaints by Phillips 66 Canada Ltd. and Cenovus Energy Inc. regarding Keystone's proposed 2020 and 2021 tolls (Phase 1) and Keystone's proposed 2022 tolls (Phase 2, if required) : Phase 1.
24614|aCanada Energy Regulator reasons for decision : |bTransCanada Keystone Pipeline GP Ltd.
2463 |aReason for decision : |bTransCanada Keystone Pipeline GP Ltd. RH-005-2020
264 1|aCalgary, Alberta : |bCanada Energy Regulator = Régie de l'énergie du Canada, |c2022.
264 4|c©2022
300 |a1 online resource (v, 71 pages).
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aReason for decision
500 |aIssued also in French under title: Motifs de décision de la Régie de l'énergie du Canada relativement à TransCanada Keystone Pipeline GP Ltd. : plaintes de Phillips 66 Canada Ltd. et de Cenovus Energy Inc. relatives aux droits proposés par Keystone pour 2020 et 2021 (volet 1) et 2022 (volet 2, au besoin) : volet 1.
500 |a"RH-005-2020."
500 |a"December 2022."
504 |aIncludes bibliographical references.
61020|aTransCanada Keystone Pipeline GP Ltd.
650 0|aPetroleum pipelines|xRates|zCanada.
650 0|aPetroleum pipelines|zCanada|xCost of operation.
77508|tMotifs de décision de la Régie de l'énergie du Canada relativement à TransCanada Keystone Pipeline GP Ltd. : |w(CaOODSP)9.925584
7760#|tTransCanada Keystone Pipeline GP Ltd.|w(CaOODSP)9.917993
830#0|aReasons for decision (Canada Energy Regulator‏)|w(CaOODSP)9.906740
85640|qPDF|s770 KB|uhttps://publications.gc.ca/collections/collection_2023/rec-cer/NE22-1-2022-2-eng.pdf