| 000 | 00000nam 2200000zi 4500 |
| 001 | 9.935190 |
| 003 | CaOODSP |
| 005 | 20250401094052 |
| 006 | m o d f |
| 007 | cr cn||||||||| |
| 008 | 240311t20242024oncao o f000 0 eng d |
| 020 | |a9780660707167 |
| 040 | |aCaOODSP|beng|erda|cCaOODSP |
| 043 | |an-cn-qu |
| 086 | 1 |aM154-166/2024E-PDF |
| 245 | 00|aExisting building commissioning : |brecommissioning (RCx) of the Sept-Îles airport facilities. |
| 264 | 1|a[Ottawa] : |bNatural Resources Canada = Ressources naturelles Canada, |c[2024] |
| 264 | 4|c©2024 |
| 300 | |a1 online resource (3 unnumbered pages) : |billustrations, photographs |
| 336 | |atext|btxt|2rdacontent |
| 337 | |acomputer|bc|2rdamedia |
| 338 | |aonline resource|bcr|2rdacarrier |
| 500 | |aCaption title. |
| 500 | |aAt head of title: Case study. |
| 500 | |aIssued also in French under title: Mise en service de bâtiments existants : recommissioning (RCx) des installations de l'aéroport de Sept-Îles. |
| 520 | |a"The mandate covered all the buildings on the Sept-Îles Airport site: the airport terminal, the integrated services building, and the pumping station. All the electromechanical systems, centralized control system and lighting controls were included in the mandate’s scope"--Commissioning scope, page [1]. |
| 650 | 0|aBuildings|xEnergy conservation|zQuébec (Province) |
| 650 | 0|aHot-water heating|xEquipment and supplies|xInstallation|zCanada. |
| 650 | 0|aBoilers|xEnvironmental aspects|zCanada. |
| 650 | 0|aGreenhouse gas mitigation|zCanada. |
| 710 | 1 |aCanada. |bNatural Resources Canada, |eissuing body. |
| 775 | 08|tMise en service de bâtiments existants : |w(CaOODSP)9.935191 |
| 856 | 40|qPDF|s1.96 MB|uhttps://publications.gc.ca/collections/collection_2025/rncan-nrcan/M154-166-2024-eng.pdf |