| 000 | 00000nam 2200000zi 4500 |
| 001 | 9.949151 |
| 003 | CaOODSP |
| 005 | 20250408091707 |
| 006 | m o d f |
| 007 | cr mn||||||||| |
| 008 | 250314e196208##abcabdo o f000 0 eng d |
| 040 | |aCaOODSP|beng|erda|cCaOODSP |
| 043 | |an-cn-ab |
| 086 | 1 |aA98-4/14-1962E-PDF |
| 100 | 1 |aGray, W. D., |eauthor. |
| 245 | 10|aConstruction report on revisions and improvements to Parr-Castor project S.W.¼ 2-38-14-W4 / |csubmitted by: W. D. Gray; prepared by: Alberta Regional Office. |
| 264 | 1|aCalgary, Alberta : |bCanada Department of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Branch, |cAugust, 1962. |
| 300 | |a1 online resource (38 pages) : |billustrations, maps, graphs, photographs |
| 336 | |atext|btxt|2rdacontent |
| 337 | |acomputer|bc|2rdamedia |
| 338 | |aonline resource|bcr|2rdacarrier |
| 500 | |aDigitized edition from print [provided by Agriculture and Agri-Food Canada]. |
| 520 | |a"The Parr-Castor dam and spillway were originally built at the request of the Rural Municipality (R.M.) of Paintearth as a stock watering project in 1950, the R.M. supplying the required right of way. The Town of Castor has tapped the reservoir for a domestic water supply. In March, 1952, the Town of Castor signed an agreement with Canada whereby the Town took over the control, management and operation of the dam and reservoir"--Page 1. |
| 650 | 0|aDams|zAlberta|xDesign and construction. |
| 650 | 0|aReservoirs|zAlberta|xDesign and construction. |
| 650 | 0|aWater-supply|zAlberta|zCastor. |
| 650 | 6|aBarrages|zAlberta|xConception et construction. |
| 650 | 6|aRéservoirs (Lacs)|zAlberta|xConception et construction. |
| 650 | 6|aEau|xApprovisionnement|zAlberta|zCastor. |
| 710 | 1 |aCanada. |bPrairie Farm Rehabilitation Administration. |bEngineering Branch, |eissuing body. |
| 856 | 40|qPDF|s50.7 MB|uhttps://publications.gc.ca/collections/collection_2025/aac-aafc/a98/A98-4-14-1962-eng.pdf |