00000000nam 2200000zi 4500
0019.950098
003CaOODSP
00520250416150319
006m     o  d f      
007cr cn|||||||||
008250414e195802##mbcado  o    f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-mb
0861 |aA98-4/32-1958E-PDF
1001 |aBerry, D. J., |eauthor.
24510|aReport : |bMorden dam spillway repairs / |csubmitted by: H. G. Riesen ; prepared by: D. J. Berry.
264 1|aWinnipeg, Manitoba : |bPrairie Farm Rehabilitation Administration, Engineering Branch, |cFebruary, 1958.
300 |a1 online resource (41 pages, 37 unnumbered pages) : |billustrations, graphs, photographs
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aDigitized edition from print [provided by Agriculture and Agri-Food Canada].
520 |a"This report contains an account of the investigation, study, and repairs undertaken on the Morden Dam Spillway in the summer and fall of 1957. This work was necessary because of the damage caused to the slab through built-up water pressure resulting from a plugged drainage system. The total cost of these repairs was $28,000"--Synopsis.
650 0|aSpillways|zManitoba|xMaintenance and repair.
650 6|aDéversoirs|zManitoba|xEntretien et réparations.
7101 |aCanada. |bPrairie Farm Rehabilitation Administration. |bEngineering Branch, |eissuing body.
85640|qPDF|s45.3 MB|uhttps://publications.gc.ca/collections/collection_2025/aac-aafc/a98/A98-4-32-1958-eng.pdf