| 000 | 00000nam 2200000zi 4500 |
| 001 | 9.950132 |
| 003 | CaOODSP |
| 005 | 20250526081110 |
| 006 | m o d f |
| 007 | cr mn||||||||| |
| 008 | 250414e195404##mbcbd ob f000 0 eng d |
| 040 | |aCaOODSP|beng|erda|cCaOODSP |
| 043 | |an-cn-sn|an-cn-ab |
| 086 | 1 |aA98-4/54-1954E-PDF |
| 100 | 1 |aBooy, C., |eauthor. |
| 245 | 10|aSouth Saskatchewan River project : |breport on the investigation into the required spillway capacity / |cprepared by: C. Booy. |
| 264 | 1|aWinnipeg, Manitoba : |bDepartment of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Branch, |cApril 1954. |
| 300 | |a1 online resource (18 pages, 13 unnumbered pages) : |bmaps, graphs |
| 336 | |atext|btxt|2rdacontent |
| 337 | |acomputer|bc|2rdamedia |
| 338 | |aonline resource|bcr|2rdacarrier |
| 500 | |aDigitized edition from print [provided by Agriculture and Agri-Food Canada]. |
| 504 | |aIncludes bibliographical references (page 6). |
| 520 | |a"To judge the adequacy of the proposed spillway for the South Saskatchewan Dam, the required degree of safety against overtopping has been discussed and standards of design have been adopted accordingly. It was associated within the limits of accuracy set by the available hydrometric and meteorological data that the proposed design would meet these requirements"--Synopsis. |
| 650 | 0|aSpillways|zSouth Saskatchewan River (Alta. and Sask.)|xDesign and construction. |
| 650 | 6|aDéversoirs|zSaskatchewan du Sud, Rivière (Alb. et Sask.)|xConception et construction. |
| 710 | 1 |aCanada. |bPrairie Farm Rehabilitation Administration. |bEngineering Branch, |eissuing body. |
| 856 | 40|qPDF|s5.74 MB|uhttps://publications.gc.ca/collections/collection_2025/aac-aafc/a98/A98-4-54-1954-eng.pdf |