Language selection

Search


Interim report Stephenfield Dam / submitted by: H.G. Riesen ; prepared by: M.D. Brown.A98-4/60-1955E-PDF

"After formal request was made to the Prairie Farm Rehabilitation Administration (P.F.R.A.) by the Province of Manitoba in August, 1951, surveys were started along that reach of the Boyne upstream from Stephenfield to select a possible site for a large storage dam"--Summary, page [1].

Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.950138&sl=0

Publication information
Department/Agency
  • Canada. Prairie Farm Rehabilitation Administration. Engineering Branch, issuing body.
TitleInterim report Stephenfield Dam / submitted by: H.G. Riesen ; prepared by: M.D. Brown.
Publication typeMonograph
Language[English]
FormatDigital text
Electronic document
Note(s)
  • Digitized edition from print [provided by Agriculture and Agri-Food Canada].
  • Includes bibliographical references.
Publishing information
  • Winnipeg, Manitoba : Department of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Branch, July 29, 1955.
Author / Contributor
  • Riesen, H. G., author.
Description1 online resource (10, 2 pages, 5 unnumbered pages) : maps, graphs
Catalogue number
  • A98-4/60-1955E-PDF
Subject terms
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.

Page details