000 01482nam##2200253za#4500
0019.620425
003CaOODSP
00520210615104046
007ta
008150406|2012||||xxc|||||     f|0| 0 eng|d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aNH18-22/112-101E
1102 |aCanada Mortgage and Housing Corporation.
24510|aIntegrated design charrette for the Beaver Barracks, Ottawa
260 |aOttawa - Ontario : |bCanada Mortgage and Housing Corporation |cAugust 2012.
300 |a9p. : |bfigs. ; |c28 cm.
4901 |aResearch highlight. Technical series |v12-101
5203 |aThrough the planning and facilitation of the integrated design charrette, the project development team for the Beaver Barracks was able to identify and implement many additional design and construction features that will improve the overall performance of the buildings. The charrette included a wide variety of project stakeholders with different perspectives on the development project to help ensure the project not only met the needs of the owner and future occupants but also stakeholders impacted by the infill development project.
563 |aPamphlet
590 |a12-46|b2012-11-16
77508|tCharrette de conception intégrée pour l'ensemble Beaver Barracks, à Ottawa |w(CaOODSP)9.629012
7760#|tIntegrated design charrette for the Beaver Barracks, Ottawa |w(CaOODSP)9.575384
830#0|aResearch highlight. Technical series ;|v12-101|w(CaOODSP)9.514826