000 01646nam##2200265za#4500
0019.652758
003CaOODSP
00520210615115856
007ta
008150407|2013||||xxc|||||     f|0| 0 eng|d
020 |a978-1-100-22795-5
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-123/2013E
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aReport of the federal review panel - New Prosperity Gold-Copper Mine Project, Taseko Mines Ltd., British Columbia / |c[by] Review Panel Established by the Federal Minister of the Environment.
260 |aOttawa - Ontario : |bCanadian Environmental Assessment Agency |cOctober 31, 2013.
300 |axi, 307p. : |bfigs., tables ; |c28 cm.
5203 |aTaseko Mines Limited (Taseko) has proposed the development of the New Prosperity GoldCopper Mine Project (the Project), 125 km southwest of Williams Lake, British Columbia. The Project would entail constructing, operating, and closing a large open pit mine, which would be built over two years and would operate for 20 years. This report presents the results of the federal Review Panel’s (the Panel) assessment of the potential environmental effects of the proposed Project.
563 |aSpiral binding
590 |a14-51|b2014-12-24
69007|aEnvironmental impact assessment|2gcpds
69007|aMining industry|2gcpds
77508|tRapport de la commission d'examen fédéral : Projet de mine d'or et de cuivre New Prosperity |w(CaOODSP)9.678027
7760#|tReport of the federal review panel - New Prosperity Gold-Copper Mine Project, Taseko Mines Ltd., British Columbia / |w(CaOODSP)9.698530