000 01822nam##2200265za#4500
0019.694768
003CaOODSP
00520210624234254
007cr |||||||||||
008150407|2011||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-18979-6
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn106-101/2011E-PDF
1101 |aCanada. |bCanadian Environmental Assessment Agency.
24510|aReport of the Joint Review Panel - Lower Churchill Hydroelectric Generation Project, Nalcor Energy, Newfoundland and Labrador |h[electronic resource]
260 |aOttawa - Ontario : |bCanadian Environmental Assessment Agency |cAugust 2011.
300 |a389p.|bcoloured maps, graphs, tables
5203 |aNalcor Energy is proposing to develop two hydroelectric generation facilities on the lower Churchill River in central Labrador with a combined capacity of 3,074 megawatts (MW) and at a cost of approximately $6.4 billion. The provincial and federal governments agreed to a joint review panel to ensure that the environmental assessment satisfied their respective legislative requirements. This summary highlights recommendations made by the Panel, to be applied if the Project is approved.
590 |a11-38|b2011-09-23
69007|aEnvironmental impact assessment|2gcpds
69007|aElectric power stations|2gcpds
77508|tRapport de la commission d'examen conjoint - Projet de centrale hydroélectrique dans la partie inférieure du fleuve Churchill, Nalcor Energy, Terre-Neuve-et-Labrador |w(CaOODSP)9.638941
7760#|tReport of the Joint Review Panel - Lower Churchill Hydroelectric Generation Project, Nalcor Energy, Newfoundland and Labrador |w(CaOODSP)9.652351
85640|ahttp://publications.gc.ca|qPDF|s5210 KB|uhttps://publications.gc.ca/collections/collection_2011/ec/En106-101-2011-eng.pdf