000 01353nam##2200265za#4500
0019.695930
003CaOODSP
00520210624234813
007cr |||||||||||
008150407|2012||||xxc|||||o    f|0| 0 eng|d
020 |a978-1-100-20416-1
040 |aCaOODSP|beng
043 |an-cn---
0861 |aR62-429/2012E-PDF
1102 |aParks Canada.
24510|aEvaluation of Parks Canada's through waterway management |h[electronic resource]
2461 |aParks Canada - evaluation of through waterways
260 |aGatineau - Quebec : |bParks Canada |cJanuary 10, 2012.
300 |a73p.|bfig., glossary, tables, photographs
5203 |aThe evaluation examined the relevance, performance (i.e., effectiveness, efficiency, and economy) and the program design of the through waterway management sub-activity and other associated “public good” aspects of waterway operations.
590 |a13-05|b2013-02-01
77508|tÉvaluation de la gestion des voies navigables de transit de Parcs Canada |w(CaOODSP)9.640050
7760#|tEvaluation of Parks Canada's through waterway management |w(CaOODSP)9.673455
7760#|tÉvaluation de la gestion des voies navigables de transit de Parcs Canada |w(CaOODSP)9.673456
85640|ahttp://publications.gc.ca|qPDF|s1.06 MB|uhttps://publications.gc.ca/collections/collection_2013/pc/R62-429-2012-eng.pdf