000 02166nam  2200337za 4500
0019.813521
003CaOODSP
00520221107141547
007cr |||||||||||
008160426s2016    oncabd  ob   f000 0 eng d
020 |a978-0-660-04953-3
040 |aCaOODSP|beng
043 |an-cn-nk
0861 |aEn106-151/2016E-PDF
24500|aSisson project |h[electronic resource] : |bcomprehensive study report.
24617|aComprehensive study report - Sisson project
260 |a[Ottawa] : |bCanadian Environmental Assessment Agency, |c2016.
300 |ax, 183, 34 p. : |bcol. charts, col. ill., col. maps.
500 |aIssued also in French under title: Projet Sisson : rapport d’étude approfondie.
500 |aCover title.
500 |a“April 2016.”
500 |aIssued also in HTML format.
504 |aIncludes bibliographical references (p. 123-124).
520 |a"Sisson Mines Ltd. (the proponent) proposes to develop an open pit tungsten and molybdenum mine, ore processing facility, and associated infrastructure (the Project) approximately ten kilometers southwest of Napadogan and 60 kilometers northwest of Fredericton, New Brunswick. The Project would operate for an estimated 27 years at a mining rate of 30,000 dry metric tonnes per day. The Canadian Environmental Assessment Agency (Agency) has evaluated the Project’s potential to result in significant adverse environmental effects. This Comprehensive Study Report (the Report) presents the Agency’s evaluation of those effects, which has taken into account technical information provided by the proponent, advice from federal and provincial experts, and comments from First Nations and the public"--Cf. Executive summary, p. iii.
69207|2gccst|aMining industry
69207|2gccst|aEnvironmental impact assessment
7101 |aCanada. |bCanadian Environmental Assessment Agency.
77508|tProjet Sisson |w(CaOODSP)9.813526
85640|qPDF|s10.13 MB|uhttps://publications.gc.ca/collections/collection_2016/acee-ceaa/En106-151-2016-eng.pdf
8564 |qHTML|sN/A|uhttps://www.ceaa-acee.gc.ca/050/evaluations/document/113759?culture=en-CA