| 000 | 00000nam 2200000za 4500 |
| 001 | 9.820335 |
| 003 | CaOODSP |
| 005 | 20241203113639 |
| 007 | cr ||||||||||| |
| 008 | 160704s1997 bcc |o f|0| 0 eng d |
| 020 | |z0-7726-2318-X |
| 040 | |aCaOODSP|beng |
| 043 | |an-cn--- |
| 086 | 1 |aEn40-227/1994-01E-PDF |
| 100 | 1 |aDrinnan, R. W. |q(Robert Warren), |d1946- |
| 245 | 10|aWater quality in the Fraser River Estuary, January 1993 to March 1994 |h[electronic resource] / |cby R.W. Drinnan and B. Humphrey. |
| 260 | |aBurnaby, B.C. : |bFraser River Estuary Management Program, |c1997. |
| 300 | |a[249] p. : |btables, figures. |
| 490 | 1 |aTechnical report series (Fraser River Estuary Management Program) ; |vWQWM 94-01 |
| 490 | 0 |aTechnical Report Series ; |vDOE FRAP 1994-18 |
| 500 | |a"March, 1997." |
| 500 | |aThe ISBN (0-7726-2318-X) of the print edition has been copied in this electronic edition. |
| 504 | |aIncludes bibliographic references. |
| 520 | |aPhysical, inorganic and organic parameters were measured between January, 1993 and March, 1994 at three stations in the lower Fraser River - in the Main Stem at Mission, in the Main Arm at Tilbury Island and in the North Arm at Oak Street Bridge. Cross-section profiles were conducted on a quarterly basis at the three sites to investigate the suitability of taking a single water sample. In addition, six sloughs within the Main and North Arms of the river were sampled twice during the study. |
| 530 | |aIssued also in printed from. |
| 692 | 07|2gccst|aWater quality |
| 692 | 07|2gccst|aWater management |
| 710 | 1 |aCanada. |bEnvironment Canada. |
| 710 | 2 |aFraser River Action Plan (Canada) |
| 710 | 2 |aFraser River Estuary Management Plan (Canada) |
| 830 | #0|aTechnical report series (Fraser River Estuary Management Program)|vWQWM 94-01|w(CaOODSP)9.802925 |
| 856 | 40|qPDF|s10.00 MB|uhttps://publications.gc.ca/collections/collection_2016/eccc/En40-227-1994-01-eng.pdf |