Rupture, TransCanada PipeLines Limited (NOVA Gas Transmission Ltd.), North Central Corridor Loop (Buffalo Creek West Section), chainage 27+996 m, near Fort McMurray, Alberta, 17 October 2013 . : TU3-8/13-0107E-PDF
"At about 0235 Mountain Standard Time on 17 October 2013, a pipeline rupture occurred on TransCanada PipeLines Limited’s (NOVA Gas Transmission Ltd.) 914-mm-diameter (36-inch-diameter) North Central Corridor Loop Buffalo Creek West Section pipeline, located southwest of Fort McMurray, Alberta. The rupture occurred in a remote location, approximately 150 m west of the Wabasca River (Chainage 27+996 m). At the time of the rupture, the pipeline was transporting sweet natural gas. A crater was created and 5 fragments of pipe were ejected up to approximately 130 m from the rupture site. An estimated 16.5 million cubic metres of natural gas was released. The rupture did not result in a fire. There were no injuries and no evacuation was required"--Summary.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.826260&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Rupture, TransCanada PipeLines Limited (NOVA Gas Transmission Ltd.), North Central Corridor Loop (Buffalo Creek West Section), chainage 27+996 m, near Fort McMurray, Alberta, 17 October 2013 . |
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Autres langues publiées | [Français] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Description | 23 p. : col. ill., col. maps |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :